Sorry, this page isn't available for your location.

The page you're viewing is for English (ANZ) region.

Working with our Vertiv Sales team enables complex designs to be configured to your unique needs. If you are an organization seeking technical guidance on a large project, Vertiv can provide the support you require.

Learn More

Many customers work with a Vertiv reseller partner to buy Vertiv products for their IT applications. Partners have extensive training and experience, and are uniquely positioned to specify, sell and support entire IT and infrastructure solutions with Vertiv products.

Find a Reseller

Already know what you need? Want the convenience of online purchase and shipping? Certain categories of Vertiv products can be purchased through an online reseller.


Find an Online Reseller

Need help choosing a product? Speak with a highly qualified Vertiv Specialist who will help guide you to the solution that is right for you.



Contact a Vertiv Specialist

Sorry, this page isn't available for your location.

The page you're viewing is for English (ANZ) region.

Leading telecoms company in Asia achieves energy savings with cooling system upgrade

November 17, 2025

A leading telecommunications provider in Singapore partnered with Vertiv to upgrade its aging CRAC units and achieve major energy efficiency gains. Through Vertiv’s CRAC retrofit service featuring Electronically Commutated (EC) fans, the company reduced cooling loads by over 70% across two data centers, achieved ROI in just three months, and strengthened its commitment to sustainability and operational excellence.

BACKGROUND

With data centers expanding in capacity, a leading Singaporean telecom provider faced rising energy costs and sustainability pressures due to aging CRAC units. Inefficient cooling, maintenance challenges, and new carbon regulations drove the need for an upgrade. Partnering with Vertiv, the company launched a CRAC retrofit project aimed at improving energy efficiency, reducing carbon footprint, and enhancing operational reliability—all without requiring a major infrastructure overhaul.

RESULTS

  • Significant reduction in cooling load: from 24KW to 7.5KW at the 6-UNIT CRAC Retrofit site, and from 18KW to 5KW at the 4-UNIT CRAC Retrofit site.
  • ROI in just 3 months without the need for a major upgrade or overhaul of cooling system.

Case Summary

Location: Singapore

Challenge: Outdated and inefficient CRAC units, resulting in high energy consumption and operational costs.

Vertiv Services:

  • CRAC retrofit service through the replacement of traditional fans with Electronically Commutated (EC) fans for variable-speed operation and precise cooling adjustments.
  • Comprehensive retrofit across multiple units at both sites.