Hyperscale Cloud Computing Provider Goes Modular for Rapid Deployment of Capacity

August 19, 2022

Background:

Accelerating demand for data led one hyperscale cloud computing provider to seek an integrated modular solution that could be deployed quickly. However, deploying these enormous power skids, which included low-voltage (LV) switch rooms complete with busbar containment, uninterruptible power supply (UPS), static transfer switch (STS), communication equipment, and power distribution infrastructure, required careful planning and project execution.

Results:

  • Tailored solution delivered quickly through efficient project phasing
  • Non-disruptive deployment with zero lost time or reportable injuries
  • On-site labor savings of approximately 75%
  • 60 MW of capacity added within a tight timeline and optimized for reliability and efficiency

 

Case Summary
Location:​

Dublin, Ireland

Critical Need:

Deploy 60 MW of capacity in support of cloud computing demand within a 20-week timeframe

Vertiv Solution:
  • Fabricated frames for overhead services
  • Switch room infrastructure
  • Data hall busbar
  • Modular power skids
  • Building information modelling and integration services