Background:
One of the main telecommunications companies in Argentina requested customized DC Power (direct current) equipment infrastructure. By expanding its services and networks, it aimed to reduce building infrastructure while optimizing operating costs.
Results:
- Construction of new equipment with very particular dimensions.
- Maximum space optimization and significant improvement in energy efficiency.
- Equipment with reliability, availability and high efficiency.
- Service provided with factory testing, training, equipment overhaul, and launch.
- Training provided online due to the pandemic.
| Case Summary | |
|---|---|
| Location: |
Argentina |
| Critical Need: |
Create a customized DC Power (direct current) equipment infrastructure by reducing the building infrastructure while optimizing its operating costs and improving energy efficiency. |
| Vertiv Solution: | |