MHR, founded in 1985, is a leading provider of HR, payroll and finance software and services. MHR’s managed payroll and private hosting services support over 10% of the UK workforce. Due to continued growth and the success of its private cloud hosting model, MHR required a third generation of data centre to support increasing customer numbers.
Results
- The next generation of MHR data centre: The newly designed facility, powered and cooled by Vertiv's solutions, provided the necessary capacity for future expansion and growth alongside highly resilient design.
- Improved power reliability and uptime: Vertiv™ Liebert ® EXL S1, Vertiv™ Liebert® EXS and Vertiv™ PowerBoard LV Switchgear systems maintained consistent and reliable power supply, minimising the risk of downtime and protecting valuable data and services.
- Temporary generator connection points: further enhanced backup power strategy.
- Optimised chilled water cooling efficiency and reduced energy consumption: Vertiv™ SmartAisle™ containment, combined with Liebert® CRV, Liebert® HPM precision cooling and Liebert® HPC-S chiller with Liebert® iCOM™ controls, delivered a fully optimised chilled‑water solution that significantly improved thermal performance, reduced energy consumption, and lowered MHR’s overall operating costs.
- Enhanced operational system performance enabled by the end-to-end Vertiv™ solution inclusive of installation and commissioning services.
- Scalable and future-ready infrastructure: The solutions allow easy expansion, enabling MHR to adapt to evolving business needs.
- Expertise and seamless integration: Sudlows’ design expertise and project management capabilities were instrumental in designing and integrating the new infrastructure seamlessly with MHR's existing environments minimising disruption and enabling optimal performance.