Vertiv experienced commissioners maximize your return by delivering improved availability, enhanced safety, increased efficiency, and reduced operational costs.
Saved This Product to Your Dashboard
You just saved this product to your dashboard to view at a later time. You can easily remove the item from your dashboard when you no longer wish to have it saved.
Please login or create an account to save this for later
Best Suited For:
- Data Center/Colocation/Hosting
- Power Generation
- Power/Gas Transmission and Distribution
- Healthcare
- Education
- Government
Product Family
Commissioning
Vertiv experienced commissioners maximize your return by delivering improved availability, enhanced safety, increased efficiency, and reduced operational costs.
Best Suited For:
- Data Center/Colocation/Hosting
- Power Generation
- Power/Gas Transmission and Distribution
- Healthcare
- Education
- Government
Benefits
Greater availability and reliability of critical systems is achieved through verification and documentation of proper system installation, startup, and operation
Less unplanned downtime results from early detection and correction of problems
Fewer repairs are likely due to proper planning and design of systems from day one
Reduced lifecycle costs result from optimizing system performance
More convenient, single-source accountability is achieved through streamlined project management and communication from your commissioning agent
More cost-effective problem resolution arises from identifying issues early in the process
Fuller system integration results from verifying that all system components work not just independently, but as an integrated system
Better informed workforce occurs as the result of training verification and the development of quality system manuals and clear operating procedures
Enhanced ongoing maintenance and performance optimization is achieved based on benchmarking data established during the commissioning process
Improved efficiency results from verification of efficiency features as part of the commissioning process
Enhanced safety and compliance results from identifying safety hazards during design reviews, inspections, testing, and occupancy
Streamlined LEED certification process occurs by commissioning per LEED requirements
More substantial return on investment results from preventing problems and downtime
Features
Commissioning specifications and plan documents are developed to clearly define the scope and schedule for all commissioning activities
Design review verifies alignment with the Owner’s Project Requirements (OPR) document, checks for quality and coordination, and ensures proper design specifications for each discipline
LEED commissioning occurs for those seeking certification and will involve a Commissioning Authority (CxA)
Schedule integration brings together commissioning and construction schedules for reporting to all parties
Contractor submittal reviews verify compliance with the OPR, evaluate submittals for system-wide operational considerations, and make recommendations for correcting any variances
Installation and startup is completed per the manufacturer’s recommendations, industry accepted standards, and the OPR
Pre-functional equipment verification for each major piece of equipment is completed to confirm compliance with the OPR and construction documents
Functional and integrated systems testing confirms all equipment operates per design intent and works collectively as an integrated system under designed load and emergency conditions
Training verification from qualified trainers is provided for both O&M staff and facility owners
Commissioning report details the entire project to demonstrate systems are performing in accordance with the final OPR
Systems manual and operating procedures are developed to ensure O&M staff has the right resource for effective system operations for many years to come
System optimization allows for fine-tuning of equipment settings or schemes after the commissioned systems are operational
Seasonal testing is performed during the project’s occupancy phase because specific environmental conditions cannot be simulated during construction
Warranty review ensures any operational or system performance issues are resolved before the warranty expires
Find Your Area Contact
Products Support Contacts
Emergency Response for Services
+1 800 543 2378
USA
Service areas of focus:
Project Services, Performance Optimization Services
Geist Support - Americas (Rack PDU and Watchdog)
Email Contact
+1 888 630 4445
1777 Yolande Avenue
Lincoln Nebraska
USA
Service areas of focus:
Project Services, Performance Optimization Services, Emergency Response, Preventive Maintenance, Preventive Maintenance for Industrial Applications, Remote Services, Spare Parts and Parts Management
Vertiv (Liebert Services)
Email Contact
+1 800 543 2378
610 Executive Campus Drive
Westerville Ohio 43082
USA
Service areas of focus:
Project Services, Performance Optimization Services, Training, Emergency Response, Preventive Maintenance, Preventive Maintenance for Industrial Applications, Remote Services, Spare Parts and Parts Management