The page you're viewing is for Traditional Chinese (Taiwan) region.

與 Vertiv 製造商的代表合作,即可根據您的特有需求配置複雜的設計。如果您是尋求大型專案技術指導的組織,Vertiv 可以提供您所需的支援。

了解更多

許多客戶都會與 Vertiv 經銷商合作夥伴合作,為 IT 應用程式購買 Vertiv 產品。合作夥伴擁有豐富的訓練和經驗,獨具優勢,能夠使用 Vertiv 產品指定、銷售和支援整個 IT 和基礎設施解決方案。

尋找經銷商

已經知道自己的需求嗎? 想要享受線上購買和宅配的便利性嗎? 某些類別的 Vertiv 產品可以透過線上經銷商購買。


尋找在線經銷商

需要協助選擇產品嗎? 與合格的 Vertiv 專家交談,讓他們協助您找到適合自己的解決方案。



聯絡 Vertiv 專家

The page you're viewing is for Traditional Chinese (Taiwan) region.

Engineering the
AI-first future

AI is reshaping data center design, operations, and strategy. As organizations scale AI workloads, power and cooling requirements are reaching unprecedented levels, demanding a fundamental shift in infrastructure. Data Center Vision— a research collaboration between Vertiv and analyst firm IDC—examines how AI-driven computing is redefining the physical and operational limits of data centers.

Download the InfoBrief Contact us

Key insights:

AI as a core workload

Generative AI (GenAI) and other AI models are no longer experimental but becoming integral to enterprise operations. Scaling these workloads requires rethinking infrastructure investments, balancing computational efficiency with energy and cooling demands, and aligning IT strategies with new economic models.

Surging power density

AI clusters are pushing rack power density beyond 1 MW—far exceeding traditional thresholds. By 2028, infrastructure will need to support extreme workloads with liquid cooling, precision power distribution, and new approaches to energy management.

Strategies for AI scale

Data centers are evolving toward modular, adaptive designs that can accommodate rapid shifts in computing demand. Organizations are integrating liquid cooling, heat recovery, and dynamic power management to sustain performance while controlling costs and environmental impact.

Why this study matters

The Data Center Vision paper, backed by IDC Research and Vertiv’s data center expertise, provides actionable insights for meeting AI’s challenges head-on.

Highlights:

80%

of CIOs will lead AI strategies by 2026.

75%

of CIOs will implement economic models to align with IT investments.

28%

of organizations cite lack of GenAI expertise as the top barrier, pushing the need for expert partnerships.

14%

of data center operators prioritize power scarcity, ranking it last among ten concerns.

Get AI-ready now. Download the InfoBrief.

選擇您的國家/區域和語言