The page you're viewing is for Traditional Chinese (Taiwan) region.

與 Vertiv 製造商的代表合作,即可根據您的特有需求配置複雜的設計。如果您是尋求大型專案技術指導的組織,Vertiv 可以提供您所需的支援。

了解更多

許多客戶都會與 Vertiv 經銷商合作夥伴合作,為 IT 應用程式購買 Vertiv 產品。合作夥伴擁有豐富的訓練和經驗,獨具優勢,能夠使用 Vertiv 產品指定、銷售和支援整個 IT 和基礎設施解決方案。

尋找經銷商

已經知道自己的需求嗎? 想要享受線上購買和宅配的便利性嗎? 某些類別的 Vertiv 產品可以透過線上經銷商購買。


尋找在線經銷商

需要協助選擇產品嗎? 與合格的 Vertiv 專家交談,讓他們協助您找到適合自己的解決方案。



聯絡 Vertiv 專家

The page you're viewing is for Traditional Chinese (Taiwan) region.

WACS Milestone Project Pushes High Speed Connectivity in Africa

Background

Headquartered in South Africa, MTN Group is a multinational mobile telecommunications company with a vast network throughout the Middle East and Africa serving over 230 million subscribers. In support of the focus on data, MTN has invested a total of USD 90 million in the subsea West Africa Cable System (WACS).

The ultra high capacity WACS submarine cable runs along the coast of Africa, linking South Africa, the Ivory Coast, Europe and the United Kingdom. This 17,200 Km long fiber optic cable was built by MTN along with a consortium of 16 leading international telecom carriers. 15 cable landing stations along the route provide these carriers access to an extensive terrestrial fiber network. The WACS 4-fiber pair cable system is a milestone project for the continent’s internet connectivity, enabling high-speed internet access throughout Africa.

Results

  • On time delivery of two energy centers and five equipment rooms with superb resiliency and high quality within 6-month time frame
  • Built to withstand rough marine conditions and corrosive atmosphere

Case Summary

Location: Nigeria and Ghana

Capacity: 14.5T Bits/Sec; 4 Fiber pair

Vertiv Solutions:

  • Two cable landing stations equipped with NetSure® DC power, Liebert® climate system, AC system with AMF panel, 4 hour battery backup, fire suppression and remote supervision
  • Five prefabricated equipment rooms with factory mounted subracks for seamless on-site installation

Critical Need:

They needed a modular cable landing station provider in the WACS project for Lagos (Nigeria) and Accra (Ghana) to deliver an energy center and supporting equipment rooms to each location. 

DOWNLOAD THE CASE STUDY

選擇您的國家/區域和語言